Our Randahl
Construction Projects

Our project profiles showcase the capabilities of our Randahl Construction Division. With over three decades of successful projects, our track record speaks for itself.

Padagis

Tank
We cut a 35’ x 15’ hole in the roof to install a tank.
This is the 6th tank we installed through the roof for their new tank farm. Each tank took 12 hours to install, we started at 6 am and finished the roofing at 6 pm. Team Randahl knocked it out of the park every time with zero issues.

Thank you Padagis
–The Randahl Construction Team

Minnesota Vikings

We built new finance offices and remodeled three offices. Even though this project was completed a few years back we are honored to be contracted to work for the Minnesota Vikings.

Thank you Minnesota Vikings
–The Randahl Construction Team

Belladerm Medspa

We built five new treatment rooms and remodeled the existing space with new cabinets, tops, paint, and floor coverings. They are a great customer and family to work with.
Thank you Belladerm Medspa

Nordstrom

Retail Remodel
This is one of many projects we have completed for Nordstrom. We installed concrete and bollards near the loading dock to protect the $35,000 roll-up loading dock doors. We continue to remodel, repair, and paint all the Nordstrom stores and the Nordstrom Rack locations.

Thank you Nordstrom
–The Randahl Construction Team

Minneapolis Plastic Surgery

Clinic Remodel
We remodel the surgery center in 14 days and nights with 33 workers. We completed this project on time and within budget. We demoed all the finishes, replaced the lighting, new med gas, plumbing, HVAC venting, new ceilings, new wall coverings throughout, enameled all doors, installed trim surgery grade flooring in the surgery center, new vinyl flooring throughout, replaced all the cabinetry, and countertops.

Thank you Mpls Plastic Surgery
–The Randahl Construction Team

Al-Shifa Dental

We completed our third expansion for Dr. Latif. We added seven additional chairs to the clinic and brought in our architects and designers to complete the expansion. We demoed the old offices and replaced the electrical system, lighting, plumbing, HVAC, new ceilings, flooring, and cabinets. We completed the project in 65 days on schedule and within budget.

Thank you Dr. Latif
–The Randahl Construction Team

Polaris

2-Hour Fire Wall
This fire separation wall was constructed to separate the manufacturing area from the area where the two new smelters were installed. We also supplied and installed two automatic roll-up 2-hour fire doors in this fire separation wall.

Thank you Polaris
–The Randahl Construction Team

Lorem

sed do eiusmod tempor
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Lorem ipsum dolor!
–The Randahl Construction Team

Lorem labore

sed do eiusmod tempor
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Lorem ipsum dolor!
–The Randahl Construction Team